# Mathematical Audit - Quick Reference Guide **Audit Date**: November 1, 2025 **Status**: CRITICAL ISSUES IDENTIFIED **Documents**: - Full Report: `MATHEMATICAL_AUDIT_DETAILED_20251101.md` - Fix Examples: `MATH_FIX_EXAMPLES_20251101.md` - Summary: `../MATHEMATICAL_AUDIT_SUMMARY.txt` --- ## Critical Issues at a Glance ### 🔴 Issue #1: Slippage Formula Completely Wrong ``` File: pkg/profitcalc/slippage_protection.go:59-67 Formula: slippage = tradeSize / 2.0 Correct: Use Uniswap V2 constant product invariant Impact: Slippage estimates are 2-5x off actual Severity: CRITICAL - Causes loss approvals ``` ### 🔴 Issue #2: Float-to-Int Truncation Rejects Valid Profits ``` File: pkg/profitcalc/profit_calc.go:214-216 Problem: netProfit.Int(nil) removes all decimals Impact: 0.00005 ETH profit (valid) becomes 0 (rejected) Severity: CRITICAL - Rejects legitimate opportunities ``` ### 🔴 Issue #3: Arbitrary 100% Profit Margin Cap ``` File: pkg/profitcalc/profit_calc.go:199-210 Problem: Rejects opportunities with >100% profit Impact: Rejects all high-margin valid arbitrage Severity: CRITICAL - Mathematically invalid ``` ### 🟠 Issue #4: Price Impact Misses Fee Deduction ``` File: pkg/math/exchange_math.go:128-146 Problem: Uses raw amountIn, not fee-adjusted amount Impact: Underestimates price impact by 0.3-2% Severity: HIGH - Leads to wrong risk assessment ``` ### 🟠 Issue #5: Arbitrary 20% Gas Buffer ``` File: pkg/profitcalc/profit_calc.go:271-273 Problem: No dynamic adjustment based on network state Impact: Profit underestimation of ~1-5% Severity: MEDIUM - Systematic bias ``` --- ## What This Means | Current State | After Fixes | |---|---| | Rejects >100% profit margins | Accepts all valid margins | | Slippage off by 2-5x | Accurate slippage estimation | | Rejects tiny profits (<1 wei) | Accepts all valid profits | | Gas costs overestimated 20% | Dynamic, accurate gas cost | | Risk assessment unreliable | Trustworthy risk assessment | --- ## Files Needing Fixes ### Must Fix (Immediate) - `pkg/profitcalc/profit_calc.go` - Lines 199-210, 214-216, 271-273 - `pkg/profitcalc/slippage_protection.go` - Lines 56, 59-67 - `pkg/math/exchange_math.go` - Lines 128-146 ### Should Fix (Soon) - `pkg/math/decimal_handler.go` - Lines 54-58, 308-312 - `pkg/uniswap/pricing.go` - Lines 22-45 --- ## Quick Fix Checklist - [ ] Remove 100% profit margin cap - [ ] Fix float-to-int profit threshold comparison - [ ] Implement proper slippage formula - [ ] Add fee adjustment to price impact - [ ] Add division-by-zero checks - [ ] Test against known Arbitrum DEX prices - [ ] Create test cases for edge cases - [ ] Document all changes - [ ] Code review by team - [ ] Deploy with monitoring --- ## Testing Requirements Create tests for: ```go ✓ High profit margins (>100%) ✓ Small profits (<0.001 ETH) ✓ Very large trades (>50% pool) ✓ Zero/near-zero liquidity ✓ Fee-adjusted calculations ✓ Different fee tiers (0.01%, 0.3%, 1%) ✓ Slippage vs known values ``` --- ## Code Snippets ### WRONG - Profit Margin Cap ```go if profitMarginFloat > 1.0 { opportunity.IsExecutable = false // ❌ Wrong! } ``` ### RIGHT - No Arbitrary Cap ```go if !math.IsNaN(profitMarginFloat) && profitMarginFloat >= 0 { opportunity.ProfitMargin = profitMarginFloat // ✓ Correct } ``` ### WRONG - Slippage Formula ```go estimatedSlippage := tradeSizeFloat / 2.0 // ❌ Wrong! ``` ### RIGHT - Proper Formula ```go // Use: slippage = tradeSize / (2*liquidity + tradeSize) // Or implement actual AMM calculation ``` ### WRONG - Type Conversion ```go netProfitWei, _ := netProfit.Int(nil) // ❌ Truncates decimals! ``` ### RIGHT - Keep as Float ```go if netProfit.Cmp(minThresholdAsFloat) >= 0 { // ✓ Preserves precision // Execute } ``` --- ## Impact on Operations ### Before Fixes - ❌ Many profitable opportunities are rejected - ❌ Slippage estimates are unreliable - ❌ Gas cost assumptions are wrong - ❌ High-margin trades deemed "unrealistic" ### After Fixes - ✅ All valid opportunities are considered - ✅ Accurate risk assessment - ✅ Dynamic gas estimation - ✅ Correct profit calculations --- ## Next Actions 1. **Immediate** (Today) - Review this audit - Understand the implications - Plan fix implementation 2. **Short-term** (This week) - Create fix branches - Implement critical fixes - Add test cases - Code review 3. **Medium-term** (This month) - Validate against real data - Monitor in staging - Deploy to production - Monitor metrics --- ## Resources - **Detailed Analysis**: MATHEMATICAL_AUDIT_DETAILED_20251101.md - **Code Examples**: MATH_FIX_EXAMPLES_20251101.md - **Full Summary**: ../MATHEMATICAL_AUDIT_SUMMARY.txt - **Uniswap Docs**: https://docs.uniswap.org/ - **AMM Formulas**: https://github.com/Uniswap/v3-periphery --- **Generated**: November 1, 2025 **Status**: Ready for implementation **Questions**: See detailed audit document