Files
mev-beta/docs/planning/SECURITY_AUDIT_FIX_PLANS_SUMMARY.md
Krypto Kajun 850223a953 fix(multicall): resolve critical multicall parsing corruption issues
- Added comprehensive bounds checking to prevent buffer overruns in multicall parsing
- Implemented graduated validation system (Strict/Moderate/Permissive) to reduce false positives
- Added LRU caching system for address validation with 10-minute TTL
- Enhanced ABI decoder with missing Universal Router and Arbitrum-specific DEX signatures
- Fixed duplicate function declarations and import conflicts across multiple files
- Added error recovery mechanisms with multiple fallback strategies
- Updated tests to handle new validation behavior for suspicious addresses
- Fixed parser test expectations for improved validation system
- Applied gofmt formatting fixes to ensure code style compliance
- Fixed mutex copying issues in monitoring package by introducing MetricsSnapshot
- Resolved critical security vulnerabilities in heuristic address extraction
- Progress: Updated TODO audit from 10% to 35% complete

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-17 00:12:55 -05:00

6.8 KiB

Security Audit Fix Implementation Plans - Summary

This document provides an overview of all detailed implementation plans created for the security audit fixes identified in TODO_AUDIT_FIX.md. Each major todo item has been broken down into detailed plans with specific tasks, time estimates, and implementation strategies.

Critical Priority Plans

01 - CRITICAL-001: Integer Overflow Vulnerabilities

Status: Partially Fixed (Swap parsing completed)
Estimate: 4-6 hours
Detailed Plan: docs/planning/01_CRITICAL-001_Integer_Overflow_Fix_Plan.md

Key Tasks:

  • Create safe conversion package for uint64 → uint32/int64 conversions
  • Add bounds checking for all affected calculation functions
  • Update error handling for conversion failures
  • Add unit tests for overflow detection

02 - CRITICAL-002: Unhandled Error Conditions

Status: Not Fixed
Estimate: 8-10 hours
Detailed Plan: docs/planning/02_CRITICAL-002_Unhandled_Errors_Fix_Plan.md

Key Tasks:

  • Add proper error handling for lifecycle management
  • Implement graceful degradation for failures
  • Create error aggregation and reporting system
  • Add monitoring alerts for repeated failures

High Priority Plans

03 - HIGH-001: Private Key Memory Security

Status: Not Fixed
Estimate: 2-3 hours
Detailed Plan: docs/planning/03_HIGH-001_Private_Key_Security_Plan.md

Key Tasks:

  • Enhance clearPrivateKey() function
  • Implement secure memory zeroing for big.Int data
  • Add memory protection during key operations
  • Create unit tests for memory clearing verification

04 - HIGH-002: Race Condition Fixes

Status: Not Fixed
Estimate: 4-5 hours
Detailed Plan: docs/planning/04_HIGH-002_Race_Condition_Fixes_Plan.md

Key Tasks:

  • Review shared state access patterns
  • Replace inconsistent atomic usage with proper synchronization
  • Add race detection tests to CI pipeline
  • Implement proper read-write lock usage

05 - HIGH-003: Chain ID Validation Enhancement

Status: Not Fixed
Estimate: 2 hours
Detailed Plan: docs/planning/05_HIGH-003_Chain_ID_Validation_Plan.md

Key Tasks:

  • Add comprehensive chain ID validation in transaction signing
  • Implement EIP-155 replay protection verification
  • Add chain ID mismatch detection and alerts
  • Create tests for cross-chain replay attack prevention

Medium Priority Plans

06 - MEDIUM-001: Rate Limiting Enhancement

Status: Not Fixed
Estimate: 3-4 hours
Detailed Plan: docs/planning/06_MEDIUM-001_Rate_Limiting_Enhancement_Plan.md

Key Tasks:

  • Implement sliding window rate limiting
  • Add distributed rate limiting support
  • Create adaptive rate limiting based on system load
  • Add rate limiting bypass detection and alerting

07 - MEDIUM-002: Input Validation Strengthening

Status: Not Fixed
Estimate: 4-5 hours
Detailed Plan: docs/planning/07_MEDIUM-002_Input_Validation_Enhancement_Plan.md

Key Tasks:

  • Enhance ABI decoding validation throughout parsing modules
  • Add comprehensive bounds checking for external data
  • Implement input sanitization for log messages
  • Create fuzzing test suite for all input validation functions

08 - MEDIUM-003: Sensitive Information Logging

Status: Not Fixed
Estimate: 2-3 hours
Detailed Plan: docs/planning/08_MEDIUM-003_Sensitive_Logging_Plan.md

Key Tasks:

  • Implement log sanitization for addresses and transaction data
  • Add configurable log level filtering for sensitive information
  • Create secure audit logging format
  • Implement log encryption for sensitive audit trails

Low Priority Plans

09 - LOW-001: Code Quality Improvements

Status: Not Fixed
Estimate: 6-8 hours
Detailed Plan: docs/planning/09_LOW-001_Code_Quality_Improvements_Plan.md

Key Tasks:

  • Fix unused function warnings from staticcheck
  • Remove dead code and unused variables
  • Improve error message formatting (capitalization)
  • Add missing documentation for exported functions

10 - LOW-002: Testing Infrastructure

Status: Not Fixed
Estimate: 8-10 hours
Detailed Plan: docs/planning/10_LOW-002_Testing_Infrastructure_Plan.md

Key Tasks:

  • Expand fuzzing test coverage for all critical components
  • Add property-based testing for mathematical operations
  • Implement integration security test suite
  • Create performance regression tests for security features

11 - LOW-003: Monitoring & Observability

Status: Not Fixed
Estimate: 6-8 hours
Detailed Plan: docs/planning/11_LOW-003_Monitoring_Observability_Plan.md

Key Tasks:

  • Add security event metrics and dashboards
  • Implement anomaly detection for unusual transaction patterns
  • Create security audit log analysis tools
  • Add performance monitoring for security operations

Implementation Phases

Phase 1: Critical Fixes (Week 1)

Total Estimated Time: 12-16 hours

  1. Complete all tasks in CRITICAL-001 and CRITICAL-002
  2. Focus on integer overflow and unhandled error fixes
  3. Implement basic testing for critical fixes

Phase 2: High Priority Security (Week 2)

Total Estimated Time: 8-10 hours

  1. Complete all high priority tasks (HIGH-001, HIGH-002, HIGH-003)
  2. Focus on private key security, race conditions, and chain validation
  3. Test security enhancements thoroughly

Phase 3: Medium Priority Improvements (Week 3-4)

Total Estimated Time: 9-12 hours

  1. Complete medium priority tasks (MEDIUM-001, MEDIUM-002, MEDIUM-003)
  2. Focus on rate limiting, input validation, and secure logging
  3. Integrate improvements and test thoroughly

Phase 4: Quality & Maintenance (Ongoing)

Total Estimated Time: 20-26 hours

  1. Complete low priority tasks (LOW-001, LOW-002, LOW-003)
  2. Focus on code quality, testing infrastructure, and monitoring
  3. Ensure system stability during these changes

Success Metrics

Overall goals for the security audit fix implementation:

  • Zero integer overflow vulnerabilities in critical code paths
  • No unhandled errors in lifecycle management
  • Proper memory security for private keys
  • Elimination of race conditions in concurrent code
  • Robust protection against cross-chain replay attacks
  • Enhanced rate limiting and input validation
  • Secure handling of sensitive information in logs
  • Improved code quality and test coverage
  • Comprehensive monitoring and observability of security events

Each detailed plan contains specific success metrics for its respective area.